COMING NOVEMBER 2026
The Lean BOM Blueprint
Bills of material that serve both lean flow and ERP planning.
Many planning problems don’t originate in MRP. They begin with the data MRP depends on, and the bill of material is a frequent and often overlooked source.
The Lean BOM Blueprint is a practitioner’s guide to designing bills of material that support lean manufacturing flow on the shop floor and accurate planning within ERP systems.

ABOUT THE BOOK
The BOM drives the planning logic. Treat it that way.
A bill of material is more than an engineering record. It helps planning determine what to make and purchasing determine what to buy. It shapes how production is organized on the shop floor and provides the material structure for accurate product costing.
This book turns more than three decades of plant and ERP experience into a practical framework for seeing where product structures create noise and redesigning them with purpose.
The book grew out of John’s 2020 article, The Phantom of Manufacturing.
WRITTEN FOR
01
Plant and operations leaders
Build product data around the way value actually moves.
02
Planners and supply chain managers
Turn MRP messages into
a signal your team can trust.
03
Manufacturing engineers
Connect engineering intent with executable plant structures.
04
ERP and IT
leaders
Make the system support the operation instead of shadow processes.
“John Paulson’s The Lean BOM Blueprint is a much-needed game-changer for businesses seeking the next step to transition the body of knowledge to the 21st century. This must-read book is packed with innovative strategies and actionable examples. A definite contribution to the BOM process!”
Dave Garwood
Author of Bills of Material for a Lean Enterprise, R. D. Garwood, Inc.
WHAT'S INSIDE
Contents
Sixteen chapters and a ten-part toolkit for aligning the BOM with how your plant actually builds.
PART I · CHAPTERS 1–4
Why the BOM is planning logic
Why lean fails without a lean BOM, how the BOM drives ERP planning, and who owns it.
PART III · CHAPTER 8
Phantoms: flow tool or hiding place?
When to use phantom assemblies, when not to, and how JD Edwards, SAP, Oracle, and Dynamics handle them.
PART V · CHAPTERS 12–14
Executing Improvement
A PDCA method for restructuring, building the team, and the pitfalls to avoid.
THE TOOLKIT · APPENDICES A–J
Templates and tools
Glossary, audit checklist, sample structures, project plan template, RACI templates, waste worksheet, recommended reading, AI with a lean BOM, governance dashboard, and a sample BOM policy.
PART II · CHAPTERS 5–7
Designing the Lean BOM
Structuring principles, the seven wastes as they show up in the BOM, and the engineering-to-manufacturing handoff.
PART IV · CHAPTERS 9–11
Aligning the Shop Floor
Material flow and kanban, work orders and routings, and BOM accuracy with a working audit program.
PART VI · CHAPTERS 15–16
Sustaining the Lean BOM
Keeping the BOM current, and making it a competitive advantage.

ABOUT THE AUTHOR
John A. Paulson
My career began in manufacturing operations and management, with responsibilities spanning production, planning and financial performance. Since 1998, I’ve advised manufacturers across 14 industries on JD Edwards applications and lean manufacturing practices. That combination of operational and consulting experience is the foundation of my book, The Lean BOM Blueprint.